Showcasing 500+ successful HVAC installations across diverse industries

500+
Projects Completed
15+
Years Experience
98%
Success Rate

Featured Projects

Explore our portfolio of successful HVAC installations across healthcare, commercial, industrial, and residential sectors.

DAYANANDA SAGAR UNIVERSITY & HOSPITAL
Healthcare

DAYANANDA SAGAR UNIVERSITY & HOSPITAL

Complete HVAC system installation for multi-specialty hospital facility

Harohalli, Kanakapura Road

DAYANANDA SAGAR UNIVERSITY & HOSPITAL

PROJECT LOCATION – Harohalli, Kanakapura Road CONSULTANTS – HVACE Consulting Engineers AREA – 74,000 Sq Ft. NO OF MANPOWER DEPLOYED – 15 PROJECT DURATION – 45 Days NATURE OF WORKS – SITC of Toilet Ventilation Fans, HVAC Lowside Ducting Work and SITC of Air Terminals. Total No of Floors – 12 Floors.
Accenture – BDC9
Commercial

Accenture – BDC9

Large-scale commercial HVAC installation for corporate office complex

Dairy Circle, Bangalore

Accenture – BDC9

PROJECT LOCATION – Dairy Circle CONSULTANTS – Innowell Engineering International Pvt. Ltd. AREA – 1,50,000 Sq Ft. NO OF MANPOWER DEPLOYED – 50 PROJECT DURATION – 150 Days NATURE OF WORKS – HVAC Lowside Ducting Work and SITC of Air Terminals. Kitchen Ventilation equipment SITC activities. Total No of Floors – 5 Floors.
VAN GOGH GARDEN
Residential

VAN GOGH GARDEN

Premium residential HVAC solutions for luxury apartment complex

Bangalore, Karnataka

VAN GOGH GARDEN

PROJECT LOCATION – Kasturba Road CONSULTANTS – Renew Consulting Engineers NO OF MANPOWER DEPLOYED – 15 PROJECT DURATION – 60 Days NATURE OF WORKS – SITC of Baby Chillers, related Valve Packages, Expansion Tank SITC, Thermal Storage Tank modification works, MS and CPVC Pipe modification works.
ALLEGIS - 4TH FLOOR
Office

ALLEGIS - 4TH FLOOR

Modern office HVAC system installation for corporate workspace

Bannerghatta Road, Bangalore

ALLEGIS - 4TH FLOOR

PROJECT LOCATION – Bannerghatta Road CONSULTANTS – Electroarc Consulting Engineers AREA – 60,000 Sq Ft. NO OF MANPOWER DEPLOYED – 25 PROJECT DURATION – 90 Days NATURE OF WORKS – HVAC Lowside Works, VRF Units, Supply, Installation, Testing and Commissioning Activities & Indoor Air Quality Testing.
TEF ROOM - M/s. BOSCH BIDADI
Industrial

TEF ROOM - M/s. BOSCH BIDADI

Specialized HVAC installation for industrial testing facility

Bidadi, Karnataka

TEF ROOM - M/s. BOSCH BIDADI

PROJECT LOCATION – Bidadi. CONSULTANTS – Design & Build Project AREA – 400 Sq Ft. NO OF MANPOWER DEPLOYED – 8 PROJECT DURATION – 45 Days NATURE OF WORKS – Precision AC Unit Supply, related Chilled Water Piping works and Ducting works with necessary Air Terminals
Snehadaan Hospital
Healthcare

Snehadaan Hospital

Critical HVAC systems for specialized healthcare facility

Sarjapura Road, Bangalore

Snehadaan Hospital

PROJECT LOCATION – Sarjapura Road. CONSULTANTS – Design & Build Project AREA – 1200 Sq Ft. NO OF MANPOWER DEPLOYED – 3 PROJECT DURATION – 30 Days NATURE OF WORKS – DX Cassette Units and DX Hi Wall Units Installation works
STP VENTILATION WORKS - M/s. HILTON HOTEL
Hospitality

STP VENTILATION WORKS - M/s. HILTON HOTEL

Specialized ventilation system for luxury hotel facility

Embassy GolfLinks, Bangalore

STP VENTILATION WORKS - M/s. HILTON HOTEL

PROJECT LOCATION – Embassy GolfLinks, Bangalore CONSULTANTS – Independent Consultant AREA – 500 Sq Ft. NATURE OF WORKS – STP VENTILATION RECTIFICATION WORKS.
GYM AREA HVAC WORKS – M/s. HILTON HOTEL
Fitness

GYM AREA HVAC WORKS – M/s. HILTON HOTEL

Specialized HVAC system for fitness and wellness facility

Embassy Golf Links, Domlur

GYM AREA HVAC WORKS – M/s. HILTON HOTEL

PROJECT LOCATION – Embassy Golf Links, Domlur CONSULTANTS – Design & Build Project AREA – 4000 Sq Ft. NO OF MANPOWER DEPLOYED – 15 PROJECT DURATION – 45 Days NATURE OF WORKS – Duct Modification works, Air terminals replacement, Testing and Commissioning of Fresh Air and Exhaust Fans
GE INDIA - WHITEFIELD
Industrial

GE INDIA - WHITEFIELD

Advanced HVAC system upgrade for industrial facility

Whitefield, Bangalore

GE INDIA - WHITEFIELD

PROJECT NAME – GE INDIA PROJECT LOCATION – Whitefield CONSULTANTS – Apec Consulting Engineers NO OF MANPOWER DEPLOYED – 30 PROJECT DURATION – 90 Days NATURE OF WORKS – Replacement of Chilled Water Header lines and rerouting through Trenches, FRP and Painting of Pipes as per Project Requirements.
ALLEGIS - 3RD FLOOR
Office

ALLEGIS - 3RD FLOOR

Comprehensive HVAC system for modern office workspace

Bangalore, Karnataka

ALLEGIS - 3RD FLOOR

Supply Installation Testing and Commissioning of HVAC Lowside works including Air Distribution components such as Rectangular Ducts, Elliptical Ducts, Plaque Diffusers, Round Diffusers, Slot Diffusers etc. Project was executed for Total Built Up Area of 45,000 SqFt. Project Included Supply and Installation of Precision AC Units serving to the Server Room, VRF Packaged AC Units for the UPS & Electrical Room and VRF Cassette Units and Hi Wall Units for the Lab Area. Soldering Arm was supplied for the purpose of Exhausting the Soldering Fumes from the Lab Area.
BOSCH ADUGODI 111A
Manufacturing

BOSCH ADUGODI 111A

Advanced HVAC system for manufacturing facility

Adugodi, Bangalore

BOSCH ADUGODI 111A

Supply Installation Testing and Commissioning of HVAC Lowside works including Air Distribution components such as Rectangular Ducts, Elliptical Ducts, Round Diffusers, Slot Diffuser, VAV Diffusers which were imported from South Africa. Top most floor had Underdeck Insulation in order to avoid the Heat Gain through Roof. Project was executed for total 6 Floors (Ground + 5 Floors) with Total Built Up Area of 38000 SqFt.